Building 360, Boola Katitjin at Murdoch University is one of the largest mass timber projects in the Southern Hemisphere. Engaged by Multiplex in 2019 under an Early Contractor Involvement (ECI) arrangement, CPD played a crucial role in the project’s buildability, logistics, and installation methodology. In 2021, CPD secured the logistics, temporary works, and installation contract to deliver this groundbreaking structure.

Primarily constructed from sustainably sourced Mass Engineered Timber, including Glulam (GLT) and Cross Laminated Timber (CLT), Building 360 is a significant achievement in sustainable building design. The structure, nearing completion, includes over 1,800 timber members, featuring some of the largest beams ever imported into Australia. CPD’s experience in the installation of mass timber structures, combined with our expertise in design, manufacturing, and connection detailing, helped bring this innovative project to life.

Key Highlights: Pioneering Sustainable Timber Construction at Building 360

a building under construction with scaffolding

Sustainability at Scale

Building 360 is a flagship mass timber project, highlighting CPD’s expertise in sustainable construction using GLT and CLT materials.

a wood structure with metal railings

Logistics Expertise

CPD provided end-to-end logistics management, ensuring the safe delivery and installation of over 1,800 timber members, some of which were the largest ever imported into Australia.

Collaborative Design Process

Engaged by Multiplex under ECI, CPD played an essential role in shaping the project’s buildability, installation methodology, and logistical framework.

Innovative Engineering

CPD’s involvement ensured the successful installation of this complex mass timber structure, setting a new benchmark for timber construction in Australia.

Challenges We Faced On The Project

Large-Scale Timber Logistics

Managing the transportation and installation of massive timber beams, some of the largest imported to Australia, required precise planning and execution.

Complex Installation Methodology

The intricate design and assembly of over 1,800 timber members called for innovative installation techniques to ensure structural integrity.

Sustainability Goals

Achieving a balance between innovative engineering and stringent sustainability standards was key to delivering this landmark project.

Featured Projects

Multiplex – Building 360, Murdoch University – Boola Katitjin

Building 360, Boola Katitjin at Murdoch University is one of the largest mass timber projects in the Southern Hemisphere. Engaged by Multiplex in 2019 under an Early Contractor Involvement (ECI) arrangement, CPD played a crucial role in the project's buildability,...

CPD Project Eaton

Featured Projects

Perkins – Eaton Library and Administration

Constructive PD collaborated with Perkins to deliver a stunning mass engineered timber structure for the Eaton Leisure and Aquatic Centre. This project is a testament to CPD’s expertise in sustainable timber design, combining functionality, aesthetic appeal, and environmental benefits. The...

Featured Projects

Salini NRW – Metronet Forrestfield Airport Link

The Metronet Forrestfield-Airport Link is a transformative infrastructure project that improves public transport access between Perth’s eastern suburbs and the airport. Led by the Salini-Impregilo and NRW Joint Venture, the $1.86 billion project provides an 18-minute train journey from the...

Featured Projects

ADCO – Port Hedland SHS

Constructive PD partnered with ADCO to deliver a high-performance facade package for the redevelopment of Port Hedland Senior High School (SHS), a critical facility in Western Australia’s Pilbara region. This project required materials that could withstand harsh environmental conditions while...

Featured Projects

Acciona – Bayswater Station

The Bayswater Station upgrade is a key part of Perth’s evolving transport infrastructure. As a major hub within the network, the station required precise, high-performance facade and acoustic solutions to enhance both functionality and aesthetic appeal. Constructive PD collaborated with...