Icon – Shenton College Senior High School

Innovative Design Meets Functionality in Education Facilities

Custom Façade Solutions for Shenton College Senior High School

Constructive PD collaborated with Icon to deliver a striking façade and sunshade solution for the redevelopment of Shenton College Senior High School. As a leading education facility in Perth, this project required innovative materials and precise craftsmanship to meet both functional and aesthetic objectives.

The scope included the supply and installation of CNC-patterned Equitone façade cladding, adding a modern and bespoke design to the school’s exterior. CPD also installed durable CFC soffit linings and prefinished aluminium sunshade window surrounds, enhancing energy efficiency while complementing the building’s contemporary aesthetic.

Key Highlights: Designing for Education and Sustainability

Custom CNC-Patterned Equitone Façade

The intricate CNC patterns on the Equitone cladding provided a unique and modern architectural feature, elevating the building’s exterior design.

Prefinished Aluminium Sunshades

External aluminium sunshade window surrounds reduced glare and heat gain, improving energy efficiency and student comfort.

Low-Maintenance CFC Soffit Linings

CPD installed robust and low-maintenance CFC soffit linings, ensuring durability and a clean finish for overhead structures.

Tailored Solutions for Education

CPD’s attention to detail and use of innovative materials resulted in a design that meets the high standards of modern education facilities.

Challenges We Faced On The Project

Precision CNC Patterning

Creating and installing the custom CNC-patterned Equitone panels required advanced engineering and precise execution.

Integration of Diverse Materials

Blending the Equitone cladding, CFC soffits, and aluminium sunshades into a cohesive design demanded close collaboration with Icon and the project team.

Functionality and Aesthetics

Meeting the dual goals of energy efficiency and striking architectural design required careful planning and material selection.

Featured Projects

Multiplex – Building 360, Murdoch University – Boola Katitjin

Building 360, Boola Katitjin at Murdoch University is one of the largest mass timber projects in the Southern Hemisphere. Engaged by Multiplex in 2019 under an Early Contractor Involvement (ECI) arrangement, CPD played a crucial role in the project's buildability,...

CPD Project Eaton

Featured Projects

Perkins – Eaton Library and Administration

Constructive PD collaborated with Perkins to deliver a stunning mass engineered timber structure for the Eaton Leisure and Aquatic Centre. This project is a testament to CPD’s expertise in sustainable timber design, combining functionality, aesthetic appeal, and environmental benefits. The...

Featured Projects

Salini NRW – Metronet Forrestfield Airport Link

The Metronet Forrestfield-Airport Link is a transformative infrastructure project that improves public transport access between Perth’s eastern suburbs and the airport. Led by the Salini-Impregilo and NRW Joint Venture, the $1.86 billion project provides an 18-minute train journey from the...

Featured Projects

ADCO – Port Hedland SHS

Constructive PD partnered with ADCO to deliver a high-performance facade package for the redevelopment of Port Hedland Senior High School (SHS), a critical facility in Western Australia’s Pilbara region. This project required materials that could withstand harsh environmental conditions while...

Featured Projects

Acciona – Bayswater Station

The Bayswater Station upgrade is a key part of Perth’s evolving transport infrastructure. As a major hub within the network, the station required precise, high-performance facade and acoustic solutions to enhance both functionality and aesthetic appeal. Constructive PD collaborated with...